BRIVERGLASS

For every "what if" you have about packaging, we have an answer. jackzhao@briverglass.com

capban

Factory & Capacity

Built for stable mass production—supported by process control, inspection gates, and export-ready packing for global delivery.

Founded in 2016 · OEM Manufacturing · FOB Qingdao

Key Capacity Facts

  • 2016

    Exported to 50+ Countries

  • 900

    +

    900+ Employees

  • 80

    +

    80+ Production Lines

  • 1,100,000

    1,100,000 Bottles / Day

  • 100,000

    ㎡

    100,000㎡ Facility

  • 50

    +

    Exported to 50+ Countries

Facilities Overview

Our facilities are organized for repeatable production and stable delivery—from forming and annealing to inspection, decoration and pack-out.

Forming & Annealing

Forming & Annealing

Inspection & Sorting

Inspection & Sorting

Decoration & Finishing

Decoration & Finishing

Packaging & Palletization

Packaging & Palletization

Warehouse & Export Loading

Warehouse & Export Loading

Process Control Map

  • Batching

    Step 01

    Batching

  • Melting

    Step 02

    Melting

  • Forming

    Step 03

    Forming

  • Annealing

    Step 04

    Annealing

  • Inspection

    Step 05

    Inspection

  • Decoration (if any)

    Step 06

    Decoration (if any)

  • Packing

    Step 07

    Packing

  • Shipment

    Step 08

    Shipment

  • Quality Gates in Production

    Incoming Inspection (IQC) for materials and components

    In-process checks (shift routines and dimensional monitoring)

    First-article approval for new items/changeovers

    Final inspection (automatic inspection + dedicated tests)

    Decoration QC before packing (if finishing is applied)

    cap4img1
  • Testing Capability Snapshot

    We verify key performance and consistency with dedicated tests. Typical checks include:

    Thickness (wall/bottom)

    Verticality / axial deviation

    Internal stress

    Impact resistance

    Thermal shock

    Sealing / pressure checks (as applicable)

    cap4img2
  • Capacity & Lead Time Logic

    Lead time is planned based on bottle type, decoration complexity and order volume. The schedule starts after deposit, final specification/artwork approval, and tooling confirmation (if required).

    Factory:

    Standard models: faster selection and production planning

    Custom bottles: tooling + sampling + golden sample approval before production

    cap4img3

Export Packing & Shipment (FOB Qingdao)

Export-ready packing standards help reduce transit damage risk. We confirm carton, partitions, palletization and markings before shipment and support repeat-order standardization.

cap5img1

Visit Us or Start Your Project

Share your bottle requirements and timeline. We will propose a workable production plan and quotation.